Bathroom with New Floor

The Challenge

This bathroom had a rotten floor and needed all the old fittings to be replaced and new ones installed in a different location within the new bathroom design.

The Solution

We used the owners’ selected tiles for both the floor and walls.  All the old plumbing and wiring was replaced.  We installed a one metre by one metre shower, a standard size bath, a 900mm wide vanity and a full size wall hung cupboard.

%

Demolition

%

Rebuild

Weeks Turnaround

Happy Client

The Results Were Amazing

The renovation took only three weeks and the owners are very happy with the results.